New distribution of mobility to C-32 and C-33 corridors with the release of the toll
Client: Infraestructuras de la Generalitat de Catalunya, SAU (Generalitat de Catalunya)
Partners: WSP SPAIN-APIA S.A.U
We carried out an analysis of the impact of the toll release on the mobility in the corridors of the C-32 and C-33 highways, which connect Barcelona with the Maresme and Vallès Oriental respectively. Throughout this project, proposals for improving connectivity and reconfiguration of these roads and the entire road network of the corridors were also evaluated. The release of the toll allowed to change the road configuration and provide greater accessibility to these roads by improving and/or creating new links and access roads, as well as studying complementary measures on parallel roads where a decrease in traffic is expected as a result of the absence of tolls, such as N-II and C-17 highways.