Barcelona Metro Line 9 – Calculation of the demand for new scenarios and preparation of indicators required by the EIB, 2017
Client: Railway Infrastructures of Catalonia (IFERCAT), Government of Catalonia
The objective of the project is pdating the demand forecast study of the Barcelona Metro lines 9 and 10 carried out by MCRIT in 2014 on behalf of IFERCAT to respond to the requirements of the EIB on its socioeconomic evaluation.
Leave a Reply
Want to join the discussion?Feel free to contribute!